Contact Us:

414 Commercial St.
Albert Lea, MN 56007
507-377-4377

Street Overlay

A street overlay is a cost effective means of extending the service life of a roadway. Typically 2-inches of asphalt are applied to an existing road surface.

This is done by first milling or grinding parts or all of the existing surface of asphalt. The reason for milling is to make room for the asphalt that is to be applied.

The asphalt is applied by a asphalt paver that spreads a consistent layer of hot asphalt down on the surface. The asphalt is then rolled or compacted with the use of a steal drum roller.

Most street overlays require the use of a outside contractor do to the need of specialized equipment.

Minnesota state law (Chapter 156 of the Session Laws of 2005) requires that "a city or county with a population of more than 15,000 must annually notify its residents of the positions and base salaries of its three highest-paid employees." For the City of Albert Lea, titles and salaries as of Jan. 1, 2019, are: City Manager, $138,375.12; Director of Public Works/City Engineer $110,780.80; and Director of Public Safety $103,646.40. Date of publication: January 23, 2019.